
New lawn in a single day.
What we do
Tear-out, soil prep, grading and fresh roll-out turf. New lawn in a single day, residential or commercial. We remove old turf, amend the soil, fine-grade for drainage, and lay fresh Kentucky Bluegrass sod, rolled tight and watered on completion.
Whether it's a full yard replacement or patching after construction, we handle the complete process from removal to aftercare guidance.

Why it lasts
Old lawn removed to bare soil. No layering new sod over dead grass.
Triple mix or compost tilled into existing soil for root establishment.
Laser-level precision to eliminate pooling and direct water flow.
Sod delivered and laid within hours of harvest for maximum root viability.
Recent work

Sod replacement
Oshawa · 2025

Poolside sod — complete
Durham Region · 2025

Backyard sod in progress
Durham Region · 2025

Pool surround - after
Durham Region · 2025

Pool surround - before
Durham Region · 2025

Front yard sod install
Durham Region · 2021

Sod removal process
Durham Region · 2025
Common questions
With proper watering, sod begins rooting within 10 to 14 days. Full establishment takes about 4 to 6 weeks. We provide detailed aftercare instructions on install day.
No. We always remove the old lawn first. Laying sod over dead or existing grass traps moisture and prevents root contact with the soil.
Spring through early fall is ideal. We can install sod from May to October in Durham Region. Early fall is excellent because cooler temperatures reduce watering needs.
