A new asphalt driveway in Pickering lasts as long as the base under it, and the part of the driveway nearest the street is controlled by the City, not by you. Michael Durham Landscaping paves and rebuilds asphalt driveways for Pickering homes: we dig out the old material to full depth, build a compacted granular base in lifts, grade the surface so water runs away from the garage and the house, and finish with a proper edge. If you plan to make the driveway wider at the curb, the City of Pickering has its own permit for that, covered below.
What a Driveway Paving Job Includes
Our driveway paving service handles the full scope, from tearing out the old surface to the final edge:
- Demolition and disposal. The old asphalt or failed material is broken out and hauled away.
- Full excavation. We remove old material to full depth. We do not pave over a cracked base, because poor base preparation is the usual reason driveways crack early.
- Compacted granular base. Crusher run is placed in multiple lifts and plate compacted, which is what stops the surface from settling.
- Positive drainage grade. The finished surface slopes away from the garage and foundation so water goes where it should.
- Edge restraint. The asphalt edges are contained so they stay in place.
Asphalt is more budget friendly and faster to install than interlock; interlock costs more upfront but offers more design options and easier spot repairs. We walk through both at the quote. We also seal asphalt driveways and repair potholes, and at the quote we will tell you whether sealing or repaving makes more sense for the surface you have.
Widening the Driveway at the Curb in Pickering
A repave is a common time to make a driveway wider. Widening on your own lot and widening the access at the street are separate questions, and the second needs a City permit.
The curb cut permit
The City's Driveway Widening and Curb Cuts page says a permit is required to cut the curb to widen the driveway apron or boulevard for a wider driveway access, and that a culvert extension may be required. The page sets out how the City typically decides the width:
- On a lot with less than 11.0 metres of frontage, the maximum driveway access width is 3.0 metres.
- On a lot with 11.0 metres of frontage or more, the maximum driveway access width is 6.0 metres.
- Only one driveway access is permitted per lot.
- The driveway has to keep a minimum clear distance from features in the road allowance such as utility boxes, boulevard trees and fire hydrants. The distance depends on the feature.
The City asks for a preliminary sketch first to confirm the project is eligible, then a completed application form with a sketch. Before the curb is cut, the area must be clear of vehicles, landscaping features and anything else in the way. Questions go to the City Infrastructure Department.
Check the Zoning By-law first
The same page asks applicants to review the parking and driveway provisions in Pickering's Consolidated Zoning By-law 8149/24 before applying, and it splits the city in two. Outside the Seaton Urban Area, the rules are in Section 5, including Section 5.11 and Table 5.3 on residential driveway and front yard landscaping requirements and maximum driveway width. In Seaton, where properties are zoned with an "S" prefix, the rules are in Section 14, and driveway widths vary by garage type and lot layout, such as an attached or detached garage and access from a street or a lane. The City says applicants are responsible for making sure the widening complies, and that site-specific exceptions may also apply.
For the grading, apron and boulevard rules that apply to any hard surface in Pickering, see our page on interlocking and hardscaping in Pickering.
Work in the Road Allowance
A driveway job sometimes reaches past the property line. Pickering's Road Occupancy Permits page says homeowners, contractors and businesses doing work that temporarily occupies a municipal road, sidewalk, boulevard or right of way need prior approval. Its list includes construction on the road or boulevard, placing dumpsters or bins on the road or boulevard, and crossing a municipal boulevard with heavy construction equipment to reach a site. The application is due at least seven days before the work for a regular permit, and ten days before a full road closure.
Homes on a Durham Regional road
Some Pickering homes front a road run by the Region of Durham instead of the City. The Region's Entranceway Permits page says a permit is required before modifying an existing entranceway, including relocating or widening it, within the Region's road allowance, and that the Region does not issue permits on local municipal roads. Other points from that page:
- Each property is generally permitted one entranceway, and if a property borders both a Regional road and a local road, the Region will require the entranceway to connect to the local road if possible.
- Curb cuts and culverts for new or modified permanent entranceways are typically installed by the Region at the owner's cost, and the owner is responsible for the rest, for example paving the driveway.
- Processing takes a minimum of 20 business days, and a separate Regional Road Occupancy Permit is needed at least two weeks before any work in the Regional right of way.
- Any paving inside the Regional road allowance needs Regional approval.
Locates before digging
Full excavation means digging. The City's New to Pickering page tells residents that any time they dig on or near their property, they should contact Ontario One Call to get a locate in advance.
Rules change, so confirm current requirements with the City of Pickering, or the Region of Durham for a Regional road, before you book the work.
Get an Asphalt Driveway Quote in Pickering
Contact us to book an on-site visit and a free quote for your Pickering driveway. For what drives the price of a new driveway, read how much an asphalt driveway costs in Ontario. For gardens, sod and other work around the house, see landscaping in Pickering.
Sources: City of Pickering, Driveway Widening and Curb Cuts; City of Pickering, Road Occupancy Permits; Region of Durham, Entranceway Permits; City of Pickering, New to Pickering.