Site excavation in Port Perry starts with paperwork as much as digging. Michael Durham Landscaping digs for driveways, foundations, pools and other projects across Port Perry and the rest of the Township of Scugog, and trenches and backfills for site servicing. Before the ground opens, utility locates have to be in place, and depending on the property, the Township, the Region of Durham or Kawartha Conservation may each have a say. Here is what each publishes.
What Our Excavation Work Includes
Our excavation and site servicing service covers digging for:
- driveways, through our driveway paving work
- foundations and exterior waterproofing
- inground pool installation and pool removal
- concrete flatwork and aggregate surfaces
- trenching and backfill for site servicing
On every job we arrange locates first, dig to the depth the work needs, place granular material in compacted lifts so the ground above does not settle, and grade the finished site so water drains away from buildings.
Before Digging in Port Perry
Locates come first
Ontario One Call now operates as Ontario Dig Authority. It says locates "are required for any project that breaks ground, no matter the size or depth of the excavation," and asks for a locate request at least 5 business days before digging. If the project changes, a new locate is required. The Township of Scugog ties this to its own permits: its Road Permits page says applicants doing any excavation must call for a locate before they can apply.
Work in the road allowance
Scugog defines the road allowance as roadways, boulevards, sidewalks and ditches. Under its Road Occupancy By-law, a Road Occupancy Permit is needed before any activity that may block it, and the Township's list of common examples includes installing underground utilities, crossing the boulevard where there is no existing entrance, and storing equipment or materials there. Applications are due at least 60 days before work begins. Utility work in the right of way also needs a Municipal Consent, which the Township issues only to utilities and others with the legal authority to build there. Rules for new or widened driveway entrances are on our landscaping in Port Perry page.
Spring load limits
The same page says the Township can enforce weight restrictions between February 1 and May 31 each year, with actual dates depending on the weather. Heavy vehicles on restricted roads then need a half load exemption permit, which affects when loaded trucks can reach some rural sites.
Water and Sewer Connections in Port Perry
The Region owns and operates the Port Perry Drinking Water System, which serves Port Perry and Prince Albert. The Region's Water Supply By-law 89-2003 splits a water service in two: the Water Service Connection, which is the Regional part joining the watermain, and the Service Pipe, which runs from the property line to the building. Under section 20, no connection may be made until the Region approves an application and the area municipality approves a plumbing permit. Charges must be paid and approval received at least three weeks before the requested connection date when the Region installs the connection. Section 23 says only the Region's employees or agents, or an applicant under a servicing agreement, may install the Water Service Connection.
To start, the Region's Connection Permits page asks owners to complete its online form. On the Township side, Scugog's Building Permits page lists installing or altering a plumbing system and converting from a septic system to municipal sewer or water among projects that need a building permit, and names a Water/Sewer Connection permit among documents an application may require. Our part is the trench and backfill.
Rural Scugog lots usually rely on septic systems and private wells. Septic clearance distances are covered on our Port Perry hardscaping page. If a property moves off a well, the Region's Private Wells page says a well contractor licensed by the provincial environment ministry must be hired to abandon it.
Fill, Grade and Working Hours in Scugog
Our landscaping in Port Perry page explains that Scugog's site alteration by-law regulates fill and grade changes. By-law 62-15 adds details that shape an excavation:
- Hours. Section 2.09 bars site alteration between 7:00 p.m. and 7:00 a.m. on weekdays, at any time on weekends and statutory holidays, during an Environment Canada wind warning, and during or within 24 hours of more than 2 millimetres of rain.
- What can go back in. Section 2.11 says placed fill must be soil, free of demolition debris such as brick and concrete, asphalt, exposed rebar and similar material.
- When no site alteration permit is needed. Section 3.02 exempts fill placed under a valid building permit, up to 500 cubic metres, when the permit's site plan shows it complies. It also exempts refilling an excavation to existing grade after a permitted demolition, and alterations under 50 cubic metres a year that do not change drainage to neighbours, stay 0.6 metres from property lines and are on lots that do not include or abut a body of water. These exemptions still require following the rest of the by-law, hours included.
Digging Near Lake Scugog
Kawartha Conservation's watershed includes portions of Scugog and drains into Lake Scugog among other waters. Its Apply for a Permit page says a permit is needed for any development in its Regulated Area, and lists fill placement, grade modifications, excavation and installing utilities such as waterlines as development. Regulated areas include valleys and lakes, wetlands and their buffers, hazardous lands and watercourses. Small jobs, such as excavation or grading of up to 20 cubic metres outside any wetland or watercourse, may qualify for a streamlined permit. Applications must state the volume and origin of any fill brought in. The page adds that a project needing its permit most likely needs a municipal permit too.
Rules change. Confirm current requirements with the Township of Scugog, the Region of Durham and Kawartha Conservation before work begins.
Book an Excavation Quote in Port Perry
Contact us to arrange a free on-site quote for excavation or site servicing in Port Perry or elsewhere in Scugog. For finishing the yard afterward, our post on proper grading around the house explains why the final slope matters.
Sources: Ontario Dig Authority (formerly Ontario One Call); Township of Scugog, Road Permits; Township of Scugog, Building Permits; Township of Scugog, Site Alteration By-law 62-15; Region of Durham, Port Perry Drinking Water System 2025 Annual Report; Region of Durham, Water Supply By-law 89-2003; Region of Durham, Connection Permits; Region of Durham, Private Wells; Kawartha Conservation, What is the Kawartha Conservation Watershed?; Kawartha Conservation, Apply for a Permit.